International Shipping: Your Complete Guide

Published January 9, 2026 · Gold Wash Plants

Shipping Gold Wash Plants Worldwide

We've shipped wash plants to over 40 countries, from Peru's remote mining regions to Papua New Guinea's island operations. After hundreds of international shipments, we've learned what works — and what doesn't. Here's your complete guide to getting your wash plant delivered safely and cost-effectively anywhere in the world.

Container Sizing: The Foundation of Your Shipping Plan

Understanding how wash plants fit in shipping containers is crucial for cost planning:

Wash Plant Model Container Requirements Approximate Shipping Weight Best For International
M50 1 x 20' container 18,000 lbs ✓ Most cost-effective
M100 1 x 40' container 35,000 lbs ✓ Good balance
M200 4 x 40' containers 140,000 lbs ○ Higher shipping costs
M300 6 x 40' containers 210,000 lbs ○ Highest shipping costs

CIF vs FOB: Understanding Your Shipping Terms

Most of our international customers choose between two shipping arrangements:

FOB (Free on Board) - Port of Los Angeles/Long Beach:

CIF (Cost, Insurance, Freight) - Your Destination Port:

Freight Logistics: Real-World Experience

Based on our shipments to major mining regions:

To Peru (Callao Port):

To West Africa (Lagos, Tema, Abidjan):

To Papua New Guinea (Port Moresby, Lae):

Telex Release and Documentation

For smooth customs clearance, ensure these documents are ready:

Telex Release Advantage: Instead of waiting for original documents to arrive by courier, telex release allows immediate customs processing with electronic documents. This saves 3-5 days and reduces demurrage charges.

Customs Brokers: Your Essential Partner

A good customs broker makes the difference between smooth delivery and weeks of delays. Choose brokers who:

Timeline Planning: What to Expect

Here's the realistic timeline for international wash plant delivery:

  1. Manufacturing: 4-8 weeks depending on model and options
  2. Pre-shipment preparation: 1 week for documentation and container loading
  3. Ocean transit: 2-4 weeks depending on destination
  4. Customs clearance: 3-10 days (varies greatly by country)
  5. Inland transport: 1-5 days depending on distance from port

Total timeline: Plan for 8-15 weeks from order to delivery at your site.

Cost Factors and Hidden Expenses

Beyond the equipment cost, budget for these shipping-related expenses:

Regional Considerations

Africa: Plan extra time for customs. Port infrastructure varies widely. Consider regional hubs like Durban for southern Africa distribution.

South America: Peru and Chile have excellent mining equipment import processes. Venezuela and Bolivia have more complex procedures.

Pacific Islands: Limited shipping schedules require precise timing. Consider air freight for critical spare parts.

Europe: Excellent logistics but high costs. Consider used equipment options for cost savings.

Our Shipping Support

We don't just manufacture equipment — we're your partner throughout the entire shipping process. Our international shipping team:

Ready to ship internationally? Call Chase at (888) 868-2650 for a complete shipping quote to your location. We'll walk you through every step and connect you with reliable logistics partners in your region.

Continue Reading

Ready to Get Started?

Get a free quote for the perfect wash plant for your operation.